The resource shall be able to perform naval analysis for installation operation not limited to: Mooring analysis; engineered lifting / upending analysis; transportation analysis; floatover analysis; Hydrodynamic database calculation.
Minimum of 5 years in Installation analysis for offshore sector
Master's degree in Naval Architecture
Mandatory software: Moses, Gmoor, Orcaflex, Mathcad
* Nice to Have: Python
MNCJobsGulf.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.