Mep Engineer

United Arab Emirates, United Arab Emirates

Job Description

MEP Engineer | Projects | AFEC

Overview of the role:

Responsible for integrating the MEP Team, delivery of Engineering deliverables, material, construction day to day administration and commissioning reports.

Responsible for ensuring zonal integration and technical fit between building and engineering systems.

What you will do:

Responsible for:

Initiation and Understanding the SOW:
  • Will be briefed by the Line Manager on the IFC documents inclusive of IFC drawings, Specifications, Addendums\xe2\x80\xa6etc
  • Briefed on the extent of the SOW in accordance with the IFC documents and tender queries.
  • In collaboration with the Line manager; understand the Risk Register and the risks foreseen to impact the project delivery from aspects such as; work program, Procurement, Engineering, Construction and Close out.
  • Ensure the inclusion of the Authorities Design NOCs as part of the IFC documents provided by the client.
  • Discuss with the line manager to understand the Key Milestones and key deliverables.
  • Familiarize self with the Responsibility Matrix detailing the interfaces of works between AFC and the MEP contractor.
  • Until the appointment of the MEP contractor, take responsibility of preparing the necessary shop drawings, Material submittals and method statements necessary to facilitate the MEP services associated with enabling works undertaken by AFC.
Key Deliverables and interim Milestones/work schedule:
  • Ensure understanding the MEP construction program. Discuss with the line manager for further clarifications and assistance.
  • Familiarize self with the project Organizational structure and key personnel
  • Understand the requirements to be provided by the MEP contractor based on the manpower histogram.
  • The line manager will explain the cost and resource loaded program; cash flow forecast submitted by the MEP contractor to align with progress at site.
  • Ensure understanding the project key deliverables and logs submitted by the MEP contractor for tracking purposes are updated on weekly basis, not limited to shop drawings, builders work logs, Material Submittals, method Statements, procurement tracking logs\xe2\x80\xa6etc
  • Ensure to be aligned with the RFI process and the extent of impact of the responses obtained from the Engineer.
  • In coordination with AFC Engineering, ensure to adequately conduct the necessary technical integration process, Zonal coordination and technical fit at interfaces between the various systems.
Operational accountability, Safety Quality and environmental,
  • Fully understand and comply with AFC HSE manual plan.
  • Ensure that the MEP Contractor duly submit the project HSE and execution plan for AFC review and approval.
  • Ensure that the MEP contractor appoints the competent HSE leads/officers duly accredited in accordance with the international standards and codes.
  • Ensure full adherence of the relevant safety, Quality and environmental procedures, instructions and controls in accordance with AFC guidelines.
  • Ensure conducting and participating the periodic toolbox talks.
  • Ensure that incident/near miss reports are timely issued, and lessons learned sessions are conducted for the project construction operatives.
Construction Management and Tracking process:
  • Verify the Key Performance Indicators of the MEP contractor and ensure that they reflect the actual achieved status.
  • Review the MEP contractor\xe2\x80\x99s submitted shop drawings, clash detection reports, material and technical submittal, method statements and drive out any deficiencies or coordination concerns prior to submission for the engineer approval.
  • KPIs shall clearly indicate Plan vs Actual achievements and shall be presented during the weekly MEP progress meetings. The outcomes of these meetings shall be shared with the line manager.
  • Coordinate the links between MEP Civil and other trades. Timely availability of Material, method statement, workforce, supervision and adequate/timely access to the certain area.
  • Ensure that the works are carried out based on Coordinated shop drawings with clash free reports, the MEP contractor conducted the necessary site survey and inspection prior to commencement, timely request for any builders work necessary for the work.
  • Ensure the QAQC procedures are in place, Material Inspection Reports are duly signed off by the Engineer.
  • Ensure to observe the quality of work and timely offered for inspection.
  • Ensure all MIRs and WIRs are signed off by the Engineer which will subsequently for the necessary substantiation of the interim Payment applications and assessment of claims/abortive works following changes.
  • Ensure to discuss with AFC Civil team the MEP contractor Logistics plan and map out the handling and movement of material and equipment.
  • Ensure conducting site walks and workshops with the MEP construction team and explain areas of concern conveyed from the Civil team.
  • Observe progress productivity trend, and report to the line manager on any deficiency.
  • Ensure to maintain robust and timely documentation/notarization of events/delays and inform the line manager for the doing the needful accordingly.
  • Ensure that the MEP contractor provides look ahead programs, register of WIRs and shared within the Contractor daily reports.
  • Ensure coordination at site during the Authorities inspections and capture the comments resulting from these visits.
Testing Commissioning and Project Close Out:
  • Ensure understanding the detailed Testing and Commissioning program extracted and integrated within the project Approved Baseline Program.
  • Ensure the attendance of the commissioning agent/specialist at early stage for inputs during Engineering/procurement/buildability stage.
  • Ensure to have possession of the approved Commissioning Method statement and strictly followed at site.
  • Ensure that the pre commissioning activities are duly performed and signed off by the Cx agent and the Engineer.
  • Ensure that all commissioning activities are adequately and sufficiently rendered, life safety and cause and effect scenarios are duly followed and implemented.
  • Ensure to maintain updated register for the elements necessary for a successful project closing out such as; red marked drawings, As built, validated material submittals, closure of NCRs, snags management, Operation and Maintenance Manuals, Training sessions conducted for the employer by the MEP contractor/specialists.
People Management:
  • Ensure to liaise with the site team and employ ownership and dedication.
  • Ensure that to communicate with MEP contractor personnel and maintain and track the lookahead programs and monitor productivity.

Bayt

Beware of fraud agents! do not pay money to get a job

MNCJobsGulf.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.


Related Jobs

Job Detail

  • Job Id
    JD1583097
  • Industry
    Not mentioned
  • Total Positions
    1
  • Job Type:
    Full Time
  • Salary:
    Not mentioned
  • Employment Status
    Permanent
  • Job Location
    United Arab Emirates, United Arab Emirates
  • Education
    Not mentioned