Contract duration Jan Dec 2026 Client Emirates Nuclear Energy Corporation (ENEC) Key Responsibilities Plan and prepare Maintenance Items (MIs) for electrical systems (switchgear, MCCs, transformers, protection relays, cables). Identify spare parts and required materials; coordinate with Procurement for availability. Review…
Duration 4 months Work Schedule 4 days on site , 1 day at HQ 38 40 hours/week Start Date Q4 2025 Key Responsibilities Prepare, revise, and update ISI engineering drawings, layouts, and as built documentation. Incorporate plant modifications, field mark…
Contract duration Jan Dec 2026 Key Responsibilities Prepare Maintenance Items (MIs) for I&C systems (transmitters, control valves, PLCs, sensors, field instrumentation). Validate equipment data against Master Equipment List (MEL) and design drawings. Coordinate with I&C Engineers, LTMS teams, and maintenance…
Contract duration Jan Dec 2026 Key Responsibilities Develop detailed Maintenance Items (MIs) for mechanical systems (pumps, valves, rotating/static equipment, piping). Define scope, resources, parts, tools, and materials required per MI. Review drawings, procedures, equipment lists to ensure configuration and traceability.…
Duration/Location • Starting date: ASAP August 2024 • Duration: 2 3 years months minimum • Location: Dubai, then missions to Gabon (~6 months for start up). • Status: Residential Activities The role of LNG Lead Process engineer includes the following…